Lab 1- Construction of Masonry Wall and Prisms

Lab

Masonry Wall Initial Rate of Absorption Mixing Mortar Mortar Workability Mortar Air Content Prism Construction

Extras

Lab Handout Sample Lab Report PhotosLab Equipment and MaterialsExtra ResourcesLab WorksheetPrinter Friendly Version


Objectives:

The objectives of this laboratory are to have students observe masonry construction and repeat the following laboratory tests and other operations involving masonry:

  • Construct a masonry mini-wall of clay masonry units
  • Determination of Initial Rate of Absorption (IRA) for clay unit using simplified method
  • Masonry mortar proportioning, batching, and mixing (PCL and MC mortar)
  • Measure mortar workability by flow table
  • Measure mortar air content by pressure-meter method
  • Construct prisms for subsequent compression and bond wrench testing